Remove and excess 2 welding machines and 1 plasma cutter from building 717-F.…
719-5N Rewire all telecommunications wiring and drops…
SRNL will test microbial extraction (biomining) of rare earth elements (REEs) and metals from REE and metal containing materials in lab scale studi…
This activity details the general operation of the FormLabs Form2 SLA resin 3D printer along with the post-processing tasks associated with 3D prin…
Remove abandoned bioassay equipment located in 735-A, C-Wing (WO No. 1832619), remove three steam/chilled water HVAC units, two abandoned exhaust f…
This activity will evaluate the chemistry and engineering aspects of a process for stripping chloride from nitric acid solutions using heat, gas sp…
152-C transformers AT2-1 and AT3-2 are approximately 65 years old, are in poor condition, and need to be replaced.…
703-B Install new clothes dryer circuit.…
Restroom trailer 773-71A, built in 1993, 478 square feet, will have services disconnected, and the trailerwill be removed to the SRSCRO N-Area layd…
Cat-6 communication cable is to be installed in the 735-B and 735-1B buildings in order to allow for Siemens Building Management System upgrades.…