Ethylene Glycol/Water with Selenium (~15 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Faci…
Ethylene Glycol with Selenium (~20 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Facility.…
Valve 442 has been determined to not be necessary to control the flow of sodium hydroxide to tanks 701 and 710 located in H-area outside facilities…
Replace the fire control panels in H-Canyon crane area.…
Salt simulants and cementitious waste forms will be made at EDL for testing up and including to 55-gallons.…
Install telecommunications to 706-B.…
Siting, construction, and operation of an administrative support structure within the K-Area Complex (KAC) at the general area of the K-Area Constr…
Construction of pre-manufactured modular offices at the general northwest outer corner of the 186-K Basin. This space is needed for personnel suppo…
Install a rainwater drain system along the 221-H East wall sections 7-18 to drain the rainwater on the roof to the stormwater system. …
A portable building in H Area was damaged by Hurricane Helene and needs to be dismantled and removed.…