The goal of this activity is to design and develop Flow Through Bed and test it against the performance of a diffuser to determine the feasibility …
HVAC unit ACU-4 in security building 705-A will be replaced due to age and deterioration. Replacement D and R and installation activities will be c…
Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…
The FTF Facility needs a permanent design for supplying Chromate Water (CRW) to F-Tank Farm tanks above grade. The route will start east of Tank 25…
Correct Adjustable Center of Gravity Lift Fixture (ACGLF) Hydraulic Leak at 660-3E.…
The U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Environmental Services (SCDES) approved soil vapor extraction…
This activity at the M-1 Air Stripper will extend two heat trace circuits.…
STAR pad trailer complex grading and sidewalk replacement, Phase 1, will take place in B-Area. Revision 1 is due to the added work scope of Phase I…
This work scope covers removing and replacing the door and door jam in the wire room and touch up painting.…
This activity covers repairing and painting walls in room 10 of building 725-N.…