Correct water intrusion at 713-1N.…
The primary objectives of this activity are to verify the manufacturability of the TEP (tokamak exhaust processing) prototypes, evaluate performanc…
The proposed activity is the abandonment of six (6) F-Canyon perimeter groundwater monitoring wells (FCA 2D, FCA 9D, FCA 10A, FCA 10D, FCA 16A, and…
As part of Athena project, NNSA is investing in infrastructure upgrades at SRNL to provide separation facilities. The clean Lab C-102 will be renov…
Remove old valve pit cover and install new concrete cover at 901-G H-10 valve pit.…
713-1N Replace east personnel door, threshold and emergency door rim device due to normal wear and tear and replace personnel door/awning located o…
Remove HVAC pad and add parking space at 731-N.…
Rev. 1 - Change activity end date. This revision is for the collection of additional soil samples to further the characterization of the vertical d…
Building 716-2A has a conventional Gamewell fire alarm system that requires a maintenance action to replace the existing conventional duct smoke de…
This Acknowledgement of Scope provides for the repainting of the crosswalks located between building No. 221-33F and building No. 717-F.…