Replace cables and posts at Lower Three Runs, Fourmile Branch, Pen Branch, and Steel Creek Stream sample locations. These cables and posts support …
This scope covers various general renovations for Building 735-11A.…
The breathing air compressor is original to the Defense Waste Processing Facility (DWPF) and was installed in the 1980's it needs to be replaced. T…
This project is a pilot-scale (up to 40 L) sieving, rinsing, and conversion of Reillex HPQ resin from the chloride form to the nitrate form. It inc…
The proposed activity is for the installation of a catalytic oxidizer unit and supporting equipment that is required for the installation of the un…
Revision 0 - Removal of Defense Waste Processing Facility Plant Air Compressors. Revision 1 - Replacement of Defense Waste Processing Facility Plan…
Repair water damage at frame and base of Southwest window at 704-30E.…
This activity investigates the formation and fresh and cured properties of lightweight cellular concrete (LCC). The three primary ingredients for L…
General renovations for Building 781-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, painting, and electrical modifi…
Ultrasonic equipment is being installed in the Saltstone mixer that will be used to remove grout material that is adhering to mixer nozzle.…