The 922 Steam Condensate Tank in 105-K requires removal and replacement.…
Renovate the kitchen at 784-3A.…
Activities to troubleshoot, repair and/or replace light fixtures in building 105-C and its surrounding building spaces inside its fenceline. This a…
The overall objective of the ISD (In-Situ Decommissioning) is to place Building 235-F in a safe, stable, and low-cost end state that supports area …
The project scope consists of the renovation and modification of building 705-A to support the development of a new computer room.…
This project is to evaluate the feasibility of incorporating a direct internal recycle loop into a fusion fuel cycle.…
The Kanne wash sink in 234-H Room 57 cannot dump waste water down to the floor drain like it is currently designed due to mercury in the line and o…
This scope of work will install hydride bed monitoring stations (HBMS) on spent hydride beds stored in the SRTE facility.…
Insulating the outer vessel of the Uranium beds (U-Beds) in TEF Furnace Extraction.…
Install a load bank for 254-10H diesel generator.…