Install a Retrofit Single-Ply 60 mil Thermoplastic polyolefin (TPO) Roofing System on Building 705-N.…
The Proposed Activity, during time of Construction, will remove obsolete D/3 Distributed Control System (DCS) hardware from the 233-H HP-PLC (Healt…
The current deionized water system does not produce the quality of water that can be used for analytical chemistry methods in lab 270.…
Currently, the electrical distribution system for 234-H is near end of life. Changes to the electrical distribution system are needed to improve th…
Roof Repair at 704-53E.…
The Saltstone Facility dry material dust collectors are to be replaced over the next few years due to being outdated and obtaining parts for correc…
The proposed activity is for Radiological Protection Department to perform a radiological survey of the building 235-F second floor exhaust ductwor…
Three (3) groundwater monitoring wells (i.e., RGW-16-C, CSB-020-B, and CSB-020-C) will be abandoned in place and three (3) replacement monitoring w…
Prep/Paint 681-3G gantry crane, catwalk rails, and concrete curb.…
Evaluate / Correct Deep Well 905-107G.…