Subcontractor will perform a roof replacement at 731-N. The Subcontractor "will" disturb the existing roof while performing this roof replacement o…
SRNL will perform laboratory experimentation to determine the flowsheet parameters necessary to safely and efficiently dissolve used nuclear fuels …
The Casting Prototype System is a vacuum induction melt (VIM) that will be used to melt surrogate material.…
This EEC outlines an extraction method for the analysis of organo-species in environmental samples (i.e. soil, sediment, surface water, ground wate…
The objective of this R and D project is to design and construct an electromagnetic (EM)-assisted alkaline electrochemical reactor for the conversi…
Fire Alarm Replacement at 736-A.…
Installation of pad for trailer 707-78B.…
B-Area trailers underpinning replacement.…
Replace carpet at 701-8G Barricade 8.…
Repair HVAC Unit No. 2 at 717-5N. Replace motor in the air handling unit at 717-5N.…