Remove commodities connecting old Thermal Arc plasma cutter CLI No. N-717001-GSE-STE-480179-in 717-1N, prep for excess. Install new Hypertherm MAX …
Install Fiber 702-H to E-Area Trailers.…
SRNL Advanced Engineering (AE) and Gas Transfer System (GTS) provide gas processing support for the Tritium facilities using non-radioactive isotop…
Three Western Sector Treatment System MicroBlowers connected to soil vapor extraction wells VEW-07F, VEW-11F, and VEW-25A will be converted to Baro…
Repairing holes in sheetrock and painting the offices, Kitchen remodel, conference room Audio/Visual upgrades. Repairing water damage to offices du…
Paint fiberglass cooling water piping and pipe supports near 785-A.…
Install Megalug cap on Mud Blow off valve 76H.…
766-H Install a timer on the exhaust fan.…
713-4N Install WI-FI.…
Hydrogen recombiner catalyst material will be evaluated in the Shielded Cells for chemical stability, radiolytic stability, and hydrogen recombinat…