This activity prepares H-Canyon and Outside Facilities (H-OF) samples for metal impurities analysis by either Inductively-Coupled Plasma Mass Spect…
For the operation of a solder reflow oven in R and D engineering environment.…
L-Area transfers of Idaho National Laboratories radiological material to Savannah River National Laboratories (SRNL) for research purposes.…
Replace damaged Subsidence Monitors No. 10 and No. 18 in E-Area…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities to include the action of evaluating items received and preparing for dispositi…
Replace HEPA filter on Nilfisk vacuum. Vacuum is use on asbestos related jobs. Revision 0 is necessary to update prefix from "OBU" to "LSES", and t…
The 603-91G Road E culvert will be repaired. The existing culvert pipes shall have new liner pipes installed inside them to extend the service life…
This Scope of Work details the work required to mill, pave, and stripe the section of Road 2 that begins at the intersection with SC-125 and ends a…
The refurbishment of Building 717-A involves multiple phases. First, the Dismantle and Removal (D and R) phase will clear the internal spaces and c…
Subcontractor will repair 730-1B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-1B. Revision 1 is nece…