This EEC covers updating existing lighting in multiple N-Area shop buildings from high pressure sodium, metal halide, fluorescent, incandescent, et…
Repair damaged domestic water (DW) line on west side of building 725-2N.…
This scope of work covers removing/excessing the old Rockwell sander in 711-9N, and installation of a new replacement Powermatic sander.…
Paint service water and river water piping at 681-3G.…
The Western Sector Treatment System has remediated soil and groundwater. As the remediation has matured, much of its equipment is no longer necessa…
Soil characterization activities (i.e. soil bores) will be performed by site Geotechnical Engineering group to support meteorological tower replace…
The size distribution of solid materials can affect how the material behaves in certain environments. One way of determining the distribution is by…
Operations in the materials characterization laboratory consists of the following activities: glass disk apparatus for preparing samples for xrf an…
These work activities are associated with the electrical repairs/upgrades to building 717-3N.…
The P Reactor Discharge Canal (PRDC) flows through two culverts under H and 8 Roads. Woody debris has accumulated in and upstream of the culverts. …