Repair the damaged flooring and install decking at the 707-81B Tornado Shelter.…
Subcontractor will repair 705-C. Revision 1 includes the additional work scope at this facility (705-C). Subcontractor will disturb the existing ro…
This scope of work is for the painting of exterior shop doors/roll-up doors, and around loading zones at 704-C.…
A vendor will generate and/or remove excess wastewater from various systems/containments located across SRS.…
Subcontractor will repair roof at 716-N. The Subcontractor will not disturb the existing roof while performing these repairs on 716-N.…
In support of an NNSA initiative to increase living / office space for employees without increasing building footprint area, the Building 105-K, Pe…
The goal of this mercury precipitation experiments is to evaluate the use of NaI in the sequestering of mercury from a typical SRS radioactive samp…
The non-functional 730-1B Charging station will be replaced and in the process brought up to current fire protection requirements with increased fu…
The Materials Technology and Energy group and the Advanced Engineering group presently house three electrical resistance welding stations, inductio…
Renovations to High Bay Rooms in Training Support Building 766-H and Installation, Maintenance, and Operation of equipment for use by SRPPF Trainin…