Air Handling Unit No. 1 at 702-2A is being replaced. The existing disconnect will be replaced with a new, windowed unit and the fuses are sized acc…
The purpose of the activity is to dismantle and decommission the 690-1G deionizer trailer. The trailer is located adjacent to the decommissioned Fo…
The No. 4 roll-up door at building 713-2N has reached the end of its expected service life. The door's condition has deteriorated to a point where …
Repair the damaged flooring and install decking at the 707-81B Tornado Shelter per E-DCP-B-25002.…
Install five HVAC Units at 704-1N.…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
120V Power and Network are needed in the H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition. Also, 120V power is neede…
Install Universal Wiring (UW) Drops in 730-1B 2nd Floor Cubes.…
This activity involves the installation or repair of external oil sampling ports on various electrical transformers throughout SRS. This is a revis…
The goal of this mercury precipitation experiments is to evaluate the use of NaI in the sequestering of mercury from a typical SRS radioactive samp…