766-H Renovate classrooms 1043,1045 and 1047. Remove items from wall, patch and prep walls to apply semi-gloss paint, remove carpet, prep floors, i…
This activity is the operation of analytical polymer characterization equipment in AMC Lab 137 - the Additive Manufacturing Support Laboratory, spe…
This activity will cover the synthesis and development of advanced materials using conventional synthetic methods. Such materials will include meta…
Three commercial fixative products will be tested by ASTM methods to confirm their suitability for D and D work in the DOE complex. ASTM methods wi…
Graphene oxide nanoribbons will be mixed in with thermoplastics when appropriate. Printing with conventional commercial FLD filaments is also detai…
Remove wallpaper/prep/paint on the west side wall at the North entrance of 704-C.…
Replace door handle on east door of 211-8H.…
A new telephone is needed in 105-L near the purification trailer space door. The existing phone lacks some of the needed emergency response capabil…
Installation of new metal building in the former location of 773-69A and 773-70A.…
Install emergency lighting in 772-7B.…