Perform various corrective and routine maintenance activities at remediation well RWM-5 in M-Area.…
The Effluent Treatment Facility (ETF) Laboratory heating, ventilation, and air conditioning system needs to be permanently replaced due to its age …
Temporarily modify Saltstone Hopper Overflow Container (SHOC) Suction Line L-131 due to missing downcomer.…
The proposed work activity is to transfer wastewater from the F-Canyon B-Basins to the Effluent Treatment Facility (ETF) using an approved Waste Co…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
The 512-S building, which is currently in the Suspended Operations state, will be modified to temporarily store Strip Effluent (SE) from the Salt W…
Renovate the women's restroom (Room 121) at 736-A per AOS work request 00824899 Rev. 3.…
This work activity is for sealing and coating the roof of 717-5N.…
Pick-up, transport and install new double-wide (DW) trailers in E-Area.…
Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…