Install solar pumping station at river water valve pit H7.…
A generator will be installed at 735-4B, the In Vivo Counting Facility, to provide emergency standby power in order to ensure continuous support fo…
Road 5 Milling, Paving, and Striping. Mill, pave and stripe Road 5 from Road 6 to Road C. Mill 3" of Road 5 and resurface with 1" Open Graded Inter…
This EEC covers stormwater outfall N-06 stormwater controls (oyster shell replacement) / maintenance (culvert repairs).…
Herpetology studies across SRS.…
The purpose of the experiment is to address the impacts of environmental stressors on aging trajectories in medaka. Work occurs across SREL laborat…
The chilled water expansion tank failed testing and requires replacement. A new bladder tank, backflow preventer, and tie-ins for the system will b…
RMS-3 radiation detection units are going to be replaced with ARM-1000 units and the radio frequency communication system will be replaced with a h…
The L-Area Emergency Basin needs some additional electrical receptacles to support the Accelerated Basin Deinventory (ABD) Project.…
Leachate characterization and stabilization of bound PFAS in grout.…