Existing sump failed and will be replaced with like-for-like sump pump. Drawings will be updated to show the current field condition in addition to…
Install Beaver Cone at 731-N basin.…
Tornado shelters shall be installed in various places around F-Area to support the SRPPF project.…
This EEC covers the collection of biotic (animal tissue/blood) and abiotic (water, sediment) samples and their processing within the lab by solid p…
Personnel Gate installation between 705-K and 717-K.…
General renovation activities for Building 645-1N…
This work activity covers sealing the roof leaks at 711-9N.…
This scope of work covers the renovation of the System One section of building 717-5N. Revision 01 added in order to cover additional work covered …
Remove commodities connecting several pieces of N-Area/PMCS shop equipment within the facility, prep for excess. Install new similar-type shop equi…
Replace No. 2 cooling tower fan shaft and components at 785-6A.…