The proposed activity is to repair/replace the compressor on the air handling unit in 292-F.…
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
Replace the two (2) inclinometer personnel platforms located at the Steel Creek Dam (686-G).…
Maintenance Dredging of River Water Intake Canal 681-3G. …
Siting, construction, and operation of an administrative support structure within the KAC property protection area (PPA) fence.…
Install pump and support lines to evacuate condensate from HVAC drain pan at the Criticality Control Overpack Pad in K-Area.…
In order to dispose of some Surplus Plutonium Disposition (SPD) chemicals via the planned method of landfill, solidification is needed.…
The Zeiss Crossbeam 550 focused ion beam (FIB) microscope is used to examine solid samples by electron imaging and x-ray spectroscopy.…
Setup and testing of CST as a dry offgas sorbent for volatile Cesium (Cs) from the simulated thermal processing of spent nuclear fuel (i.e. cesium …
This activity will investigate the effects of various processing conditions (e.g., heat, hydrogen, air) on vacuum oils. Isotope exchange efficiency…