Categorical Exclusion Determinations: Savannah River Operations Office

This activity will remove the eleven light poles from the E-Area Parking Lot and install four new LED flood lights to existing power poles located …
Process Water Well 905-88H needs modifications to be set to Out of Commission status. This will consist of air gapping from the main water system a…
A Subcontractor will repair the roof of 709-7G. The Subcontractor "will not" disturb the existing roof while performing these repairs on 709-7G.…