The objective of this R and D project is to design and construct an electromagnetic (EM)-assisted alkaline electrochemical reactor for the conversi…
Fire Alarm Replacement at 736-A.…
Installation of pad for trailer 707-78B.…
B-Area trailers underpinning replacement.…
Replace carpet at 701-8G Barricade 8.…
Repair HVAC Unit No. 2 at 717-5N. Replace motor in the air handling unit at 717-5N.…
The addition of the two Tees on the Domestic Water line would allow for easy connection points if access to domestic water is needed. The Tees will…
The HANM Primary Stripper 2 (P2) System has experienced several piping failures due to chloride induced stress corrosion cracking. In addition, hea…
Install Road from S-Area to 299-H through CIF (607-35H) gates.…
Relocate Monitoring Equipment in 105-L…