Small radioactive particles will be deposited on planchets using aerosolization. These particles will be used as reference standards for various an…
Install Piezometers at Pond 2 Dam and Pond 4 Dam for Geotechnical Investigation/Characterization.…
Replacement of the 221-F Canyon roof to fix water intrusion into 221-F. Conduit, piping and walkways will be removed to effectively replace roof.…
TEF Operations will be performing a one-time removal of consolidated waste from cutterhead maintenance jobs and load the waste into a B-18.…
The current P-Evac system is to be replaced with a new hybrid design to replace outmoded components.…
The exterior of building 751-1A will be pressured washed and repainted.…
Installation of a new Tritium Entry Sign with a Digital Sign.…
Inspection and/or treatment of currently installed steam poles in A and SRNL Technical Area.…
The Bayco Burnout Oven and Stack will be repainted.…
Installation OF TESCAN MIRA microscope into glovebox (A-773000-OGE-GB-58) in Building 773-A.…