Removal of existing damaged tower structure and construction of Meteorological Towers and appurtenances.…
Operations in the x-ray diffraction laboratory (773-A C-119/123) in the Savannah River National Laboratory (SRNL) consisting of the following: a ra…
Cosmetically refurbish the interior of Trailer 704-23G.…
Install a Liquid Applied Unisil High Solids Silicone Roof Coating on the Metal Roofing System on Building 719-N. The roof sections shall encompass …
Receptacles to accommodate portable welding machines will be installed into existing disconnects in building 717-3N.…
Perform internal/external repairs to the 782-3A facility.…
R and D for the development of ceramic and halides based crystal growth samples. The crystals grown in this lab will be using chemical vapor transp…
Subcontractor shall provide services of equipment, materials, and facilities to perform, services necessary to conduct Maintenance and other relate…
Recent rains and water damage occurred in the building (760-4G) that requires removal of all interior materials, walls boards, and insulation. The …
The existing ceilings located in rooms 189 and 190 shall be partially raised and removed.…