As part of Athena project, NNSA is investing in infrastructure upgrades at SRNL to provide separation facilities. The aging infrastructure and equi…
SRNL seeks to establish the capability of performing open-air releases of chemical and biological materials on site so that the plumes may be measu…
Modification of Sprinkler Heads in UPS Room in 703-44A. The sprinkler system in the UPS room has gaps in coverage must be upgraded in accordance wi…
Two (2) new Double Wide trailers were purchased and will be installed in B-Area for future housing needs for SRNS Projects. The building numbers de…
Replace existing manual pump to an automatic pump on 901 Tank in H-area.…
Cut empty totes in A Area for disposal to Three Rivers Landfill.…
Perform pinch welding activities on stainless steel, titanium alloys and aluminum alloys. The pinch weld process is a solid state welding process t…
Optical apparatus in AMC lab 139 will be used to measure the change in transmittance of polymer-coated, metal films. The aim of the experiment is t…
R and D activities covering the assembly, testing, and maintenance of equipment and systems designed by the SRNL Global Security Department, activi…
Install new ice maker at 710-14N. Install insulation around domestic water line. D and R overhead light and replace light switch with receptacle.…