This EEC covers general renovations and modifications to C and B Wing in 773-A.…
In support of the Disposition Planning for the K-Area Complex, Building 107-K is proposed for Dismantlement and Removal (D and R).…
Air Compressor Z-210000-PIG-CMP-0001 (e.g., PIG Air Compressor) is leaking coolant. If the air compressor fails, Saltstone Production Facility (SPF…
Replace cover system with more durable materials at (CIG) Mound Cover in E-Area.…
703-1B and 730-B Install Fiber Cables Between Buildings.…
This Acknowledgement of Scope provides for the habitability improvements in rooms No. 103, No. 104, No. 105, No. 106, No. 113, No. 114 and No. 116.…
Install audio reinforcement in 731-1N.…
The PA is a redesign of the existing Glovebox Stripper blowers under MT-TRI-2021-00017 Rev. 2. It redesigns the existing Glovebox Stripper blowers …
Mark-18A Cask processing including activities L-Area performs for cask equipment qualification and shipment readiness.…
702-1C Remove floor support poles and install new roof supports.…