Remove Lead Blankets from Sealand and Remove Mold.…
The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …
Grouting of Intermediate Level Vault (ILV) Cells. Cells to be grouted are Intermediate Tritium (IT) Vault 2, Intermediate Non-Tritium (INT) Vault 4…
This is a general EEC to cover the synthesis of dust from various mineral oxide powder starting materials. Test dust materials will be synthesized …
M-DCF-H-13025 is to install a TIDS sample point on to NEVAC Tank B. The sample point would allow for sample bombs to be connected to NE-TB to colle…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
Replace TRU PAD man doors : 660-14E/660-15E/660-17E/660-19E.…
This scope of work covers the installation of flooring in the women's and men's restrooms in System One section of building 717-5N.…
Work will be completed in a contamination area and tritiated materials will be studied. These materials will be analyzed in small quantities and co…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…