The current Portable Air Compressors have recently been replaced to increase reliability of backup process air. In addition to these new 3 compress…
Lab 144 is used by Hydrogen Processing Group for general R and D activities. These activities include using the cold saw, drill press, and belt san…
Operation of spark plasma sintering (SPS) equipment in HTRL 136.…
The AbrasiMet M Saw will be used to section metallurgical samples (steel, stainless steel, aluminum) for support of R and D programs.…
Replace Automatic Entry Doors at 730-2B and 730-4B…
This EEC covers stormwater outfall N-06 and N-12A stormwater controls (oyster shell replacement) / maintenance (culvert repairs)…
Extraction of core samples on Schmitt Road in N-Area in preparation for road rehabilitation.…
This work consists of removing an out-of-service safety shower/eyewash station and its indicator light from Room 35 in 233-H. This D and R is to pr…
Four double-wide trailers will be removed and replaced with (4) new double-wide trailers in the same locations. The old trailers will be excessed o…
Disconnect and relocate double-wide trailer 773-68A from current location and install in N-Area for reuse.…