Scope of work is to replace fuel oil heater No. 23 in building 711-9N. Existing fuel oil heater is no longer working due to normal wear and tear an…
Update QA Receipt Inspection Area in 731-1N.…
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
722-4A Habitability improvements.…
Replace the flooring in rooms No. 1 and No. 2 of building 702-D.…
Habitability improvements in rooms No. 101, No. 102, No. 103, No. 104, and No. 105 in building No. 731-4N.…
Removal of equipment originally used by MOX from Building 221-21F to Excess/Salvage - Salvage Yard Transfer Building 741-1N. Preparation includes, …
The existing Buildings 264-H and 264-2H Safety Significant (SS) Fire Suppression Systems (FSS) need to be upgraded/qualified to meet Seismic Design…
CX-035390: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)
The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM. The n…
Subcontractor will provide roof repairs. The Subcontractor will not disturb the existing roof while performing these repairs.…