The U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Environmental Services (SCDES) approved soil vapor extraction…
This activity at the M-1 Air Stripper will extend two heat trace circuits.…
STAR pad trailer complex grading and sidewalk replacement, Phase 1, will take place in B-Area. Revision 1 is due to the added work scope of Phase I…
This work scope covers removing and replacing the door and door jam in the wire room and touch up painting.…
This activity covers repairing and painting walls in room 10 of building 725-N.…
The Subcontractor will provide roof repairs to stop leaks at 225-6H.…
Perform maintenance on South Centennial Office Complex Security System.…
This activity will remove the eleven light poles from the E-Area Parking Lot and install four new LED flood lights to existing power poles located …
The 234-H instrument air COPCO compressors have reached their end of service life and are not operational. This EEC is to evaluate the use of porta…
Replace with like-for-like 4-ton HVAC unit at 701-2K.…