Instrument Air Compressors for Building 234-H are reaching their end of life and must be replaced. Replacement parts are no longer available…
SRTE Security and NNSA Security has requested Property Protection Area (PPA) RAPs be replaced with RAP-IIs to allow escorting into the area using A…
This EEC will cover pH, conductivity, and deuterium by FTIR methods. The pH and conductivity methods are performed using a combination meter that c…
The objective is to react the uranium oxides with HCl to form uranium chloride compounds distributed in the molten carrier salt. The off gas will b…
The purpose of this project is to install an interlocking function between the ventilation exhaust and the flammable gas supply lines of the D-0101…
701-2L has a door that requires replacement of the door and frame to ensure the new door operates normally with ease. Another door needs repair wor…
Installation of WIFI on the 3rd floor of 730-1B.…
Renovate office spaces at 704-C.…
Replace flooring in rooms 1 and 2 at 702-D.…
Provide labor, material, and services required for the removal of a degraded overhead door and the installation of a new like-for-like overhead doo…