Characterization of P-Area Groundwater Operable Unit plumes is required. In Fiscal Year 2026, this will include drilling 18 soil borings to collect…
Construction to repair to perform building renovations in 778-2A…
Remove existing epoxy coating from 681-3G traveling screen deck and recoat.…
Cool Seal Roof 716-8B.…
Install WIFI at 735-2B.…
Update all lighting fixtures to LED throughout the facility at 716-N.…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Venting gas cylinder bottles for the disposal of lecture bottles thru recycling in A-Area hoods.…
Prep and apply Cool Seal to roll-up doors 1 and 2 at 705-C.…