Removal and Replacement of Defense Waste Processing Facility Plant Air Compressors.…
The facility needs a redesign of the current camera grout hopper lid assembly to ease maintenance activities.…
The Stack 291-F Canyon Exhaust Fan (CAEX) No. 2 Power Analyzer is not working intermittently and will be swapped with CAEX No. 3 Power Analyzer.…
Maintenance on equipment and leaks repair for MK-18A located in building 773-A shielded cells.…
A commercial, argon atmosphere furnace in 773-A, Lab D-0142, will be used for metallic sample fabrication with trace amounts of depleted uranium an…
As part of Athena project, NNSA is investing in infrastructure upgrades at SRNL to provide separation facilities. The aging infrastructure and equi…
SRNL seeks to establish the capability of performing open-air releases of chemical and biological materials on site so that the plumes may be measu…
Modification of Sprinkler Heads in UPS Room in 703-44A. The sprinkler system in the UPS room has gaps in coverage must be upgraded in accordance wi…
Two (2) new Double Wide trailers were purchased and will be installed in B-Area for future housing needs for SRNS Projects. The building numbers de…
Replace existing manual pump to an automatic pump on 901 Tank in H-area.…