Rad Monitor replacement at F and H Retention Basins.…
Add crusher run and grade as needed in storage areas and additional area at 713-2N.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181. This EEC is a revision to OBU-H-2024-00028 to extend the end date.…
Storm drain piping in 105-L will be replaced…
LED Lighting Replacement Project, K-Area, will re-lamp the greater portion of K-Area in light emitting diode (LED) technology.…
Transport, Receipt, and Unloading of Samples from VC Summer.…
Activation of molecular sieve adsorbents by flushing helium through the adsorbent while heating to remove adsorbed water and air.…
The scope of this activity covers the initial assembly, test setup and operation of the helium (He) leak detection equipment and instrumentation fo…
The Casting Prototype System is a vacuum induction melt (VIM) that will be used to melt surrogate material.…
This EEC entails the use of the 4700 Precision Diluter from Entech Instruments, which is used to created gas mixtures. This instrument can accurate…