This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…
Routine maintenance activities and custodial services for Buildings 292-2F and 294-2F and to include associated structures during which operations …
Revision 2: There are 12 total transformers, three on each of the 4 Precipitators. Through drone flights, we were able to verify the 12 transformer…
This activity covers routine handling (mixing, cleaning, sampling, pH adjustment, etc.) of chemicals at 999-1W (ACTL) to support other R and D acti…
Functionality verification of Haake rheometers using NIST traceable oil standards will be performed. …
Cleaning and surface modification of wrought and additive manufactured stainless-steel components will be performed. Electropolishing and electropl…
704-1N Install awning at double doors of room 140. …
Remove/demo shuttle shelter 54-17G located in the parking lot of 731-N. …
Install 2 new hot water tanks at 766-H per engineering SOW.…
Clean and repaint the service bridge at 686-G, Steel Creek Dam.…