Installation of 14 New Cubes in 704-1N Room 117.…
The Control Room C-041 Monitoring and Control System DCS in Building 773-A will be upgraded by replacing the existing Programmable Logic Controller…
This EEC covers the use of the non-rad pyroprocessing system.…
Routine maintenance activities and custodial services for Building 772-F to include associated structures during which operations may be suspended …
A propane torch/vacuum pump apparatus will be used to seal quartz sample ampoules under vacuum.…
Upgrade PLC's (Programmable Logic Control), Control Panels and related infrastructure for the deionizer and sand filter in 105-10L to newer equipme…
Mesoporous alumina (Al2O3) will be synthesized using alcohols , acid, an aluminum precursor, and a directing agent.tivities.…
Hose changeout in the 105-L Transfer Bay due to scheduled preventive maintenance or damage.…
In 2024, surface water flow sensors were installed at two locations in Pen Branch near CMP Pits as part of the Rev 0 EEC.…
Construction to repair HVAC duct at 731-5N due to storm damage.…