Installation of an air filter into the plant air line that is feeding the plasma table in building 717-3N.…
In support of various R and D activities, gas chromatography will be used to analyze gas samples that may include (but not limited to) the followin…
The planned work is to replace the fuel oil pump for diesel fuel tank 619-2N located adjacent to building 717-8N.…
This EEC covers updating existing lighting in multiple N area shop buildings from High pressure sodium, metal halide, fluorescent, incandescent, et…
The work group shall provide the A-Area cooling water chemical building, 780-2A, with refurbishments to bring the building back up to adequate aest…
The Saltstone Process Room ventilation is a once-through system not designed for continuous personnel occupation.…
731-N Repair toilet.…
The existing Environmental Control (EC) Programable Logic Controller (PLC) is obsolete and will be upgraded with an Emerson's DeltaV module.…
High winds from a recent storm damaged a shed behind the 263-242F quonset hut. The Buildings, Grounds, and Maintenance group will be demolishing th…
Repair Containment Dike 622-N.…