This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
Install Telecommunications to 704-76E.…
Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs, cooling water effluent head plugs, emergency pu…
Seal Outside Holes at 701-1A.…
This activity will upgrade the H Canyon north end elevator.…
The Hot and Cold Nitrogen System will be purged with nitrogen first and then with Air Compressors.…
The filtration rate at the Salt Waste Processing Facility (SWPF) has been significantly less than the design target. Savannah River Mission Complet…
Empty Shipping Containers require annual maintenance and testing to ensure the container meets all SARP requirements. The annual maintenance and te…
Amphibian ecotoxicology studies in H-02 wetland.…
The existing R-22 HVAC unit in the back of 701-2L is to be replaced with a R-410A unit that was on site, but has never been used.…