Subcontractor will provide roof repairs at 781-A. The Subcontractor will not disturb the existing roof while performing these repairs on 781-A.…
The Power Conditioner in 735-B Room 508 has failed and is being replaced with a new transformer.…
Replace 702-1C Stand-by Diesel Generator.…
Install telecommunications to bldg. 704-41G. This includes installing grounding, pulling cables, installing 4x8 sheet of plywood and painting it.…
623-29G Install BARD type A/C unit.…
623-34G Install BARD type A/C unit.…
D and R abandoned air compressor, dryer, piping, and supports under awning on west side of 725-1N.…
Savannah River Site (SRS) has identified potential locations that could support a utility-scale solar power plant to achieve the goal of 100 percen…
This EEC covers Housekeeping/HEPA Vacuum Clean-up in the Materials and Testing Equipment (M and TE) Lab at Building 713-1N.…
HVAC units in buildings 781-A and 749-A will be replaced due to age and degradation. Replacement D and R and installation activities will be comple…