Overhaul of the compressed air system in L-Area due to age/reliability issues.…
Chemical addition components on the north wall of 780-2A are abandoned and no longer functional. Remove electrical feed to abandoned junction boxes…
717-11A Replace flooring.…
The F Tank Farm facility requires the replacement of RADCON trailer 241-24F. The trailer is aged and needs to be replaced to enhance work related a…
Establish 12 new vadose zone lysimeter stations in E-Area around the perimeter of ET3, ET4, ST10, and ST14.…
A metal hydride waste heat transfer station will be tested in 999-2W, lab 193.…
Testing will be performed using ruthenium, alkali and secondary metals which will be deposited onto solid palladium surfaces through electroless de…
Testing the use of electrolytic dissolver to dissolve a variety of materials (e.g. Hastelloy X, Haynes 25 alloy) and chemical dissolution of BeO-Fe…
This EEC covers work that is done in the High Pressure Laboratory at 723-A. The High Pressure Laboratory pressure tests and leak tests components f…
Installation of Wi-Fi in 713-N.…