The proposed work activity is to drain three totes containing wastewater from the F-Canyon Railroad Tunnel Sump (RRTS) to the Effluent Treatment Fa…
Control room and restroom renovations at 681-3G.…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…
Simulants of Hanford nuclear waste will be made and spiked with radioisotopes (for example, Tc-99) so that radioactive removal processes can be tes…
Dismantle and dispose of two Handi-Houses No. SRS-PB-00685 and SRS-PB-00698 F-Retention Basin…
Part of the roof of Building 281-19F was previously damaged during a storm. The building does not require a roof and to eliminate a potential safet…
722-4A PMCS To remove 12 inches of insulation.…
Subfloor Repair/Replace and Carpet in 704-738K.…
Remove velcro, mud and paint walls in 730-2B, Room 222.…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 18), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…