Categorical Exclusion Determinations: Savannah River Operations Office

The work group shall provide the A-Area cooling water chemical building, 780-2A, with refurbishments to bring the building back up to adequate aest…
The scope of this work is to mill, pave, install rumble strips and stripe approximately 4.7 miles of remaining section of Road C.…