Groundwater recovery well RWM-001-R is being connected to the M-1 Air Stripper to replace recovery well RWM-001. Savannah River National Laboratory…
This Acknowledgement of Scope provides for the replacement of the front entrance door on the West side of building 7No. 03-1B.…
Install Telecommunications in New Cubes in 704-1N.…
This EEC covers work that is done in the High Pressure Laboratory at 723-A. The High Pressure Laboratory pressure tests and leak tests components f…
Temporary Power is to be supplied to the Defense Waste Processing Facility (DWPF) Melter Dome Heathers during planned power outage.…
BAL and EC and ACP plan to absorb their excess chemicals that have been approved for disposal as Special Waste.…
Mix and Dispose of Chemtreat CT38 With Absorbent from 789-2B.…
Remove existing material (gravel) to a depth of 6 inches and resurface with 6 inches of asphalt at various locations at SRS.…
727-2N Apply Cool-seal to roof.…
Rehabilitate the Private Parking Lot at 706-N, repair localized pavement distress between the private parking lot at 706-N and the Government Parki…