General renovations performed for E-Wing in 773-A.
Building 749-A will be converted to a Vault Type Room (VTR).
Building 723-15A will be converted to Vault Type Rooms (VTR).
Residual sample material from on-site facilities and/or applicable customers will be dispositioned using the SRNL's HAD system once analytical char…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Renovate the alternate Emergency Operations Center (EOC) located at 735-B.…
Install Domestic Water line at 737-18A per M-FCR-A-00155.…
Sample for Tc-99 at 4 Upper Three Runs Stream locations for analysis.…
The goal of this activity is to design and develop Flow Through Bed and test it against the performance of a diffuser to determine the feasibility …