Clean up all asbestos debris from cracked window glazing and encapsulate remaining asbestos material in place in L-Area.…
Install Receptacles in 105-L…
This Acknowledgement of Scope provides for the repair of the sheetrock and installation of an access door for the valve behind the sheetrock in roo…
Subcontractor will provide roof retrofit at 315-M. The Subcontractor "will not" disturb the existing roof while performing this roof retrofit on 31…
Replacing older HVAC at 731-1N to incorporate outside air into building. A new disconnect will also be installed for this replacement.…
Rewire 704-N With CAT6a Cable.…
Modify the sidewalk at 701-21G and 701-20G (Jackson and New Ellenton barricades).…
Repair insulation on CMM(Computer Measuring Machine) duct work at 766-H.…
CX-034212: Reseal Underground Cell Covers (Storage Tank Room Plugs, Heat Exchangers, etc.) in L-area
Plugs (hatch covers) for underground locations in L-area (i.e, storage tank room, heat exchanger room, etc.) will be cleaned and resealed. This is …
Air Handling Unit AHU-3804 is approaching the end of its expected service life. The operation of the HVAC System is critical to support the Tritium…