Replace the fire control panels in H-Canyon crane area.…
Salt simulants and cementitious waste forms will be made at EDL for testing up and including to 55-gallons.…
Install telecommunications to 706-B.…
Siting, construction, and operation of an administrative support structure within the K-Area Complex (KAC) at the general area of the K-Area Constr…
Construction of pre-manufactured modular offices at the general northwest outer corner of the 186-K Basin. This space is needed for personnel suppo…
Install a rainwater drain system along the 221-H East wall sections 7-18 to drain the rainwater on the roof to the stormwater system. …
A portable building in H Area was damaged by Hurricane Helene and needs to be dismantled and removed.…
The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…
This activity will be to perform the 751-1A roof replacement. Remove the old roofing system down to the concrete/metal decking. Install a vapor bar…
Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced.…