The current asphalt locations at 749-A and the SRNL Courtyard need repairs due to vehicle wear and tear over time.…
The twelve existing Consolidated Hood Exhaust (CHEX) 24" X 24" X 11.5" plywood frame Flanders ALPHA 95 filters on the service floor in building 735…
The TN7 cask platform behind 105-L needs disposal. In order to get it to solid waste, rigging will disassemble the platform to reduce the size and …
The Domestic Water (DW) line going into building 218-H and downstream of hose bib connection valve HQ-234000-DW-V-80.006-1 will be cut and capped f…
Relocation of Mass Spectrometer System at SRNL to Building 234-H. This EEC is to update from previous NNSA-H-2021-0025 (Rev. 0 and Rev. 1)…
The proposed solution involves the comprehensive replacement and upgrade of the obsolete RHA Cask Handling Crane PLC and I/O Modules.…
Transfer of tritiated coupons from SRNL to 234-7H for storage.…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor. Revisio…
This DCF is a design change that adds 3 additional parts to improve efficiency of the portable supply.…
Savannah River Site (SRS) is granted access to perform environmental monitoring at Steel Creek Plantation (Creek Plantation).…