Replacement of lighting to take place at 736-A in rooms 101-A, 102, 124, 126, 129, 130, 131, 131-A, 132, 133, 134, 135, 136, 136-A, and 143 thru 15…
Replace lights and switches in building 763-141N.…
Seal exterior duct flashing on the East side of 731-3N.…
Repair the water hammer issue in the Truckers lounge restroom.…
Repair concrete floor at door threshold in the 731-1N warehouse.…
Repair wall and door frame at 731-1N Room 134.…
Revision 14 expands the scope of work to include generation of simulants supporting the Direct Feed High Level Waste (DFHLW) process at Hanford, in…
This activity covers the heat treatment of materials in different atmospheres. Samples that may be heated include: zeolites, metal-organic-framewor…
As part of externally funded projects to support NNSA NA-24 nuclear safeguards activities, actinide-bearing particulates will be produced using an …
The steam line that used to feed 706-H is still currently connected to the H-Area header, but there is no longer a need for the steam supply to tha…