Categorical Exclusion Determinations: Savannah River Operations Office

Savannah River Site (SRS) has identified two viable locations, Sites C and G, that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Free Electricity by 2030. A meteorological weather station will be installed at Solar Site C to gather data.
This activity is for the Renovation of Tornado Shelter walkways (aluminum landings, modular ramp, concrete sidewalk). The renovations include walkways at the following shelters: 707-29F, 707-30F, 707-31F, 707-32F, 707-33F, 707-34F, 707-35F, 707-36F.
The small scale crystal synthesis lab will grow intermetallic and oxide crystals of non-rad samples. The crystals will be grown using liquid flux a…
Valve 442 has been determined to not be necessary to control the flow of sodium hydroxide to tanks 701 and 710 located in H-area outside facilities…