This project is for building an office inside of room 230 of building 704-4N.
Savannah River Site (SRS) has identified two viable locations, Sites C and G, that could support a utility-scale solar power plant to achieve the goal of 100 percent Carbon Pollution Free Electricity by 2030. A meteorological weather station will be installed at Solar Site C to gather data.
Construction to modify existing ice maker with a new bigger bin and install another new ice machine at 713-N.
Subcontractor will provide roof repairs at 704-32G.
This activity is for the Renovation of Tornado Shelter walkways (aluminum landings, modular ramp, concrete sidewalk). The renovations include walkways at the following shelters: 707-29F, 707-30F, 707-31F, 707-32F, 707-33F, 707-34F, 707-35F, 707-36F.
Subcontractor will provide roof repairs at 703-1B.
The small scale crystal synthesis lab will grow intermetallic and oxide crystals of non-rad samples. The crystals will be grown using liquid flux a…
Ethylene Glycol/Water with Selenium (~15 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Faci…
Ethylene Glycol with Selenium (~20 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Facility.…
Valve 442 has been determined to not be necessary to control the flow of sodium hydroxide to tanks 701 and 710 located in H-area outside facilities…