Installation of Tornado Shelter 707-3N.…
714-2N Roof retrofit replacement.…
Revision 2: Updated proposed activities to reflect current planned activities. The Surplus Plutonium Disposition Project is occurring in K-Area, bu…
The South Carolina Department of Transportation (SCDOT) plans to execute a quitclaim deed transferring 1.5 acres of land and improvements to the U.…
Replace obsolete TEF Furnace Extraction Turbomolecular Pumps. Design is required for installation of replacement model pumps and associated pump co…
784-7A Vendor to Clean Various Locations in Powerhouse.…
In order to protect the integrity of the Deionized Water Basin, over pressurization needs to be avoided. A pressure relief valve is accordingly bei…
Uranium will be separated from radioactive sample matrices by use of UTEVA resin. Liquid residue will be created from the additional radioactive ma…
Accumulated rainwater is to be pumped from the 607-1F primary sedimentation tank (rectangular basin) and sludge digestion (circular) tank to the 60…
The scope of this work order is to clear the dirt and debris from the raceway trough near the South Steam Station. The conduits in the trough will …