Replace Light Fixtures 713-1N.…
A new radio station will be set up outside of 236-3F to allow radios to be used outside.…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 234-H Tritium Air Monitoring system. Parts…
The objective of this R and D project is to design and construct an electromagnetic (EM)-assisted alkaline electrochemical reactor for the conversi…
The environmental drilling contractor will install eight (8) multi-level monitoring wells. Each well shall have three (3) screen intervals for a to…
Propylene Glycol (~165 gallons) with a concentration range of 50-54 percent will be drained into the Sanitary Sewer for treatment at Central Sanita…
Replace damaged grating on ramp 5/6 expansion joint.…
The Zeiss Sigma VP scanning electron microscope (SEM) is used to examine solids for imaging and elemental analysis.…
New polymers will be synthesized in 735-11A lab 131 using CHEX-HOOD-131-26 to make new ion exchange materials. Work will likely occur in 735-11A, L…
Daily operation of microscopy and spectroscopy instruments in 735-A, D-137.…