730-1B NNSA Executive Office Suite Renovation. A portion of the third floor of 730-1B will be renovated for a new NNSA executive office suite.…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
The proposed work activity is to remove HVAC metal frames from Building 221-F because they are falling apart and pose a safety hazard to personnel.…
L-Area will replace the Electronic Safeguards and Security system with an Argus system.…
The Purpose of this project is to repair and restore the Kennedy Pond Bridge (603-41G) embankments damaged due to scouring occurring at both abutme…
Installation of four (4) sidewalks at building 730-1B and building 730-4B. Installation of one (1) crosswalk at building No. 730-4B.…
Install Power supply at 717-F remote monitoring station.…
Upgrading the SRS technological infrastructure by installing underground fiber optic cable at various locations across the site.…
Subcontractor will remediate the mold and remodel building 704-49S.…
The Parrott lab is conducting research concerning the effects of contaminants on ecological and reproductive health in various herpetofauna species…