Install Video Teleconference (VTC) in 717-11A.…
A buttress wall addition is being added to the Saltstone Vault 4, North Wall, for structural support…
This EEC is a revision of a previous EEC with a different prefix [OBU-H-2021-0225]. The PA is a redesign of the existing Glovebox Stripper blowers …
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals.…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory (Building 999-1W…
Portable gas chromatographs will be used to measure the composition of gases from laboratory experiments at 999-1W. REV. 1 is an extension of the A…
A chemical vapor deposition (CVD) method will be used to prepare nanomaterials. Rev. 0 - Work location moved to AMC. no scope changes from former E…
Soil characterization activities (i.e. soil bores) will be performed by site Geotechnical Engineering group to determine soil composition and water…
Hasp-type locks will be installed on interior doors in 221-F.…
Creating safe pathways down to Joyce Branch for environmental sample collection.…