Disassemble and Remove UPS System and repair sheetrock in 702-F. The UPS battery system is no longer in use, and it needs to be removed from 702-F.…
Install new associated utilities to support a new Ice Maker in 217-3H.…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …
In support of the Disposition Planning for the K-Area Complex, Building 108-4K is proposed for Dismantlement and Removal (D and R).…
Removal of 10 handi-houses and 3 Sealands located on one of star pad legs in B Area.…
The purpose of this scope of work is to detail the work required to safely and efficiently remove the abandoned barricade (701-19G) on Road 8. Asbe…
Removal and replacement of gutters and downspouts on the exterior of 704-4N and 704-N. Patch siding in locations where needed.…
The Saltstone Process Room ventilation is a once-through system not designed for continuous personnel occupation. Current Saltstone Process Room Ve…
The Saltstone Process Room Ventilation system is to be permanently replaced due to its age and efficiency. To facilitate this replacement, it was d…
This EEC covers various routine roofing maintenance activities that occur in and around the buildings within the SRPPF Complex Area.…