Replacement of flooring in the hallway, and rooms No. 117, 118, 119, 120, 121, 122, 123, 124, and 126 of building 731-1N. …
This EEC covers removing/replacing flooring, toilets and painting of the upstairs bathroom at 713-1N…
PMCS to re-lamp all fluorescent non-emerg. lights. Replace with UL A B bulbs in bldgs. 730-4B/703-46A/703-47A/719-5N.…
Install wall navigators in 730-B, 730-1B, 730-2B, and 730-4B.…
716-B Install receptacles for new tire machines. Tire machines are out of service and ordered new machines that have now arrived, but need a 24V co…
Renovations in the 918 Room Material Access Control (MAC) Center and 914 fan room…
The proposed work activity is the replacement of the entire 772-4F.…
The objective of the Campus Master Plan is to create a site infrastructure vision in alignment with site missions at the Savannah River Site. This …
Analysis of water samples using liquid scintillation spectrometry.…
Passive counting of potentially radioactive samples using commercial radiation counting systems (i.e. alpha, beta, and gamma detectors/counting sys…