Revision 0 - Removal of Defense Waste Processing Facility Plant Air Compressors. Revision 1 - Replacement of Defense Waste Processing Facility Plan…
Repair water damage at frame and base of Southwest window at 704-30E.…
This activity investigates the formation and fresh and cured properties of lightweight cellular concrete (LCC). The three primary ingredients for L…
General renovations for Building 781-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, painting, and electrical modifi…
Ultrasonic equipment is being installed in the Saltstone mixer that will be used to remove grout material that is adhering to mixer nozzle.…
BSRA/SRNL with the funding of DOE-EM will be leasing Suite A1 space in Discovery Plaza, located at One 7th Street, Augusta, Georgia. Suite A1 is 35…
Replace gutters at 713-N.…
L-Area Fuel Point Closure at 715-L. Provide labor, materials, and services to permanently close the L-Area Fuel Station. Closure must comply with r…
Replace HVAC unit at 713-N Tool Room.…
Install new level transmitters for tank cells A, B, C and D to provide level monitoring and communicate back to the remote level monitoring system.…