The scope of this work is to develop deep eutectic solvent pairs for the separation of light isotopes of lithium and boron. …
TS/Repair Fuel Oil Heaters at Building 711-N. …
In accordance with FCR M-FCR-A-00149 addressing configuration changes necessary for removal of the existing 780-1A Caustic Tank and Diaphragm Pumps…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F).…
Routine maintenance activities and custodial services for Buildings 292-2F and 294-2F and to include associated structures during which operations …
Revision 2: There are 12 total transformers, three on each of the 4 Precipitators. Through drone flights, we were able to verify the 12 transformer…
This activity covers routine handling (mixing, cleaning, sampling, pH adjustment, etc.) of chemicals at 999-1W (ACTL) to support other R and D acti…
Functionality verification of Haake rheometers using NIST traceable oil standards will be performed. …
Cleaning and surface modification of wrought and additive manufactured stainless-steel components will be performed. Electropolishing and electropl…
704-1N Install awning at double doors of room 140. …