CX-034607: Add N-Area Generator(s) for Use Greater Than 12 Months to the Insignificant Activity List
Surplus Plutonium Disposition (SPD) has been erecting quonset huts in N-Area. Units that will be used for a process for 12 months or more must be "…
At 607-1F rectangle basin, we will install a temporary cover to prevent water from accumulating inside it. To install this cover, some conduit and …
Rev. 1 - Building changed from 291-F to 221-F. The receptacles for the sump pumps on the 221-F roof will be replaced with a new weatherproof type.…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities to include the action of evaluating items received and preparing for dispositi…
701-2L has a door that requires replacement of the door and frame to ensure the new door operates normally with ease. Another door needs repair wor…
Replace existing lighting fixtures with LED fixtures in building 711-N.…
Install locking receptacles, duplex receptacles, and LED Lights. Installing two 480v receptacles, three 120v receptacles, and one 280v receptacle. …
Bench testing and troubleshooting activities primarily for robotics at the Advanced Manufacturing Collaborative.…
Legacy chemical containers in 105-C will be sampled and then disposed of following characterization.…