The 1st Cycle Programmable Logic Controller (PLC) manufactured by Quantum is now considered obsolete. The replacement plan involves relocating the …
719-5N Renovate Drug Alcohol Testing Area.…
The Region 3 Radiological Assistance Program (RAP) is designing and constructing a facility to accommodate personnel, equipment, and vehicles for t…
This project will include the generation of hydrogen isotopologues, its impurities and analysis of said compounds by various analytical techniques.…
In an effort to meet the needs of the site, perform a camera conversion at 701-1A ECF.…
Subcontractor will provide roof repairs at 705-3C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-3C.…
Augusta Industrial to pump approximately 12,000 gallons of Hazardous Waste Oil into Clean Harbors Tankers at 184-2k.…
Remove waste oil from two 500 gallon containers (Container No. 8 and Container No. 9) at 716-4N.…
Various oils will be transferred from old drums to new drums in Building 703-14F.…
The scope of work for renovating Building 704-2H includes applying coatings to the walls, replacing the bathroom vanities, removing carpet, and ins…