This scope covers the venting of small quantities (t,1 L/min) of gas (hydrogen, nitrogen, argon) from a permeation test system at 999-2W, lab 134.…
STAR pad trailer complex grading and sidewalk replacement, Phase 1, will take place in B-Area.…
709-8G Install Bunkhouse Trailer/sleeping quarters and parking lot.…
General maintenance activities required by SRNL personnel for AMC.…
Remove and dispose of restroom trailer 724-50E.…
EEC is needed for the Refurbishment of Building 717-A.…
Replace Building 704-16G Fire Alarm Control Panel (FACP) and upgrade Fire Alarm and Detection (FA and D) System.…
Subcontractor will provide roof repairs at 705-8H. The Subcontractor will not disturb the existing roof while performing these repairs on 705-8H.…
Replace lights in building 704-N.…
EEC included routine maintenance to replace outmoded components to install Wi-Fi and universal wiring in Building 236-3F. Additional renovations to…