Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Renovate the alternate Emergency Operations Center (EOC) located at 735-B.…
Install Domestic Water line at 737-18A per M-FCR-A-00155.…
Sample for Tc-99 at 4 Upper Three Runs Stream locations for analysis.…
The goal of this activity is to design and develop Flow Through Bed and test it against the performance of a diffuser to determine the feasibility …
HVAC unit ACU-4 in security building 705-A will be replaced due to age and deterioration. Replacement D and R and installation activities will be c…
Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…
The FTF Facility needs a permanent design for supplying Chromate Water (CRW) to F-Tank Farm tanks above grade. The route will start east of Tank 25…
Correct Adjustable Center of Gravity Lift Fixture (ACGLF) Hydraulic Leak at 660-3E.…