This EEC will cover the use of Beta Ionix III systems for air sampling activities.…
Carbon steel coupons exposed to playground sand will be analyzed for corrosion. Vapor corrosion inhibitors will be added to the sand to evaluate th…
The fire department will be using non-PFAS foam for training activities at 706-C.…
The receptacles for the sump pumps on the 291-F roof will be replaced with a new weatherproof type.…
Valves are being added to the Nitric Acid Addition System at the Salt Waste Processing Facility (SWPF) for Personnel Radiological Dose reduction an…
This is a proposed activity to pour new concrete pads and install two new Quonset huts on pads and modify fence location in the HY1 laydown yard fo…
Cationic and anionic species separation using a commercial ion chromatography system.…
Install WiFi service at 735-B and Install UW Drop in 735-B Room 132.…
Repair damaged domestic water (DW) line on north side of building 717-8N.…
Renovations to the Weapons Support Building (WSB) 236-3F to install Wi-Fi and universal wiring.…