Remove power columns in 731-4N.…
This scope of work was previously evaluated under EEC OBU-H-2019-0019. Since a revision was required and the EEC database no longer uses the previo…
The first product evaporation (1CU) and second product evaporation (2EU) streams are currently equipped with OptiMax Model 6000 Colorimeters to mea…
HVAC units in buildings 781-A and 749-A will be replaced due to age and degradation. Replacement D and R and installation activities will be comple…
Additional modifications at 501-A. Revision 1 necessary to extend the end date and added work scope: Replace 501-A Diesel Generator and Associated …
Replace Fire Alarm Control Panel (FACP) in Support Building 902-8H for Cooling Tower 285-11H.…
The aboveground make-up water piping behind 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This work removes …
The scope of work for this project involves the refurbishment of the women's changing room on the first level of 221-H. The tasks include wall repa…
This activity will investigate, down-select, and test hydrogen compression systems in lab 155 in 999-2W. Various equipment will be utilized to acco…
The operation of a manual vertical mill machine at Building 999-2W, Lab 137 and associated wastes generated.…