Generators for use greater than 12 months to be added as insignificant activities.…
At the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU), one existing monitoring well (CMP 50B) has been determined to be compromise…
Maintenance will replace the packing material in the M-1 Air Stripper Column.…
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Storm drain piping in 105-L will be replaced.…
Reactor slugs and surrogate materials will be dissolved and tested in SRNL for off gas testing. Solution preparation and mock-up testing will be co…
Development of ionic liquids will be investigated in 935-W. Major activities include synthesis of ionic liquids (IL) with varying cation and anion …
Installation of fused disconnect to lower arc flash category of precipitator closet.…
B Area trailers 707-70B, 707-71B and 707-78B require electrical installation. This adds scope to prior NEPA evaluation to install the trailers.…
Construction of new gravel parking lot in B-Area.…