CX-035846: Impurity Removal (IR-6) - Flow Through Bed Development

The goal of this activity is to design and develop Flow Through Bed and test it against the performance of a diffuser to determine the feasibility …

Office of NEPA Policy and Compliance

May 18, 2026
Estimated Read Time   min

The goal of this activity is to design and develop Flow Through Bed and test it against the performance of a diffuser to determine the feasibility of ultimately replacing diffuser trains with a series of FTBs. FTBs will be loaded with Pd/k.