Paint exterior of spare 18" river water globe valve.…
Painting without stripping/sanding/scraping in L Area Complex.…
Upgrade PLC's (Programmable Logic Control), Control Panels and related infrastructure for the deionizer and sand filter in 105-10L to newer equipme…
Video Teleconferencing equipment will be relocated between various SRPPF buildings to support transition of building ownership.…
This activity involves heating already-prepared metal samples in a furnace (still solid), placing them into a mold, and mechanically shaping them i…
GTSTG uses the Environmental chamber (EC) in 723-A for Function testing as requested by the DA's and for unloading as requested by SRTE.…
The Analytical Development Section (ADS) in SRNL performs a variety of dissolution methods. This EEC discusses the various disposition paths for re…
This R and D project will be examining separation of various uranium salts from environmental samples. The separation will employ solvent extractio…
Prep/Apply coatings to I-beam and place grout in storage room. …
Replacing an amplifier with a new one and rewiring the new one.…