The overall scope of this R and D activity is to carry out organic synthesis of organic ligands, ionic liquids, metal-organic frameworks, and organ…
730-1B Installation of Wi-Fi in Conference Rm. 204.…
Install Junction Box in Transformer Room 4 to Support PA Speaker/Channel Moves.…
This Temporary Modification will install a Peterson Products Company Multi-Flex inflatable plug inside manhole P68 near the 234-H cooling towers.Re…
Radiological buffer and contamination areas will be re-painted in H area due to normal wear and tear and weathering. Several buildings will also be…
The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …
Replace light switch and lights in Rm 3 of building 704-N.…
This EEC is for instruments designated as Gas Chromatograph / Mass Spectrometers (GC/MS) that are used in the Analytical Development Section (ADS) …
Replace split and package units AT 751-1A. The units are old and need replacing.…
Repair the sanitary sewer line in Building 784-7A.…