Construction to D and R existing air compressor and dryer and install new air compressor and dryer at building 711-9N.…
Lab No. 144, Bldg No. 935-W (AMC) is being renovated to house a new mission (AMC-W-2025-00009), Crystal Growth Lab for Nuclear Detector application…
The 221-H gang valve corridor HVAC units have exceeded their life expectancy and must be replaced to mitigate temperature concerns in the gang valv…
Thermal Cycle Absorption Process (TCAP) Product Storage Bed C is to be replaced by new components in-kind and add TCAP Product Storage Bed C relief…
Large items designated and approved as scrap metal for the Salvage Yard will be cut down to ensure they fit into 30-yard roll-off pans. These pans …
Patching and painting holes in Building 704-N, rooms No. 72 and No. 18. …
Replace the North personnel door and frame at 713-2N. Repair wall and ceiling insulation at 713-2N warehouse.…
Repair the awning at 714-2N.…
Pole K1225 needs to be replaced, and pole 37 needs repairs. Note: This EEC is a revision of OBU-K-2024-00001 to update the prefix and extend out th…
The EEC evaluates the chemical cleaning process to remove the scale deposits from the 242-16H (2H) evaporator pot using nitric acid and in-pot neut…