120V Power and Network are needed in H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition.120V Power will need to be fed…
Office of NEPA Policy and Compliance
July 13, 2026120V Power and Network are needed in H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition.120V Power will need to be fed from an available Lighting Panel. Network ethernet cable from workstation will need to be routed to the Network Cabinet in the Control Room.