CX-036216: Route 120V Power and Network Cable for L-Area VMAC Remote Workstation (RWS) in H-Area

120V Power and Network are needed in H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition.120V Power will need to be fed…

Office of NEPA Policy and Compliance

July 13, 2026
Estimated Read Time   min

120V Power and Network are needed in H-Area 4th Level Control Room for L-Area VMAC Remote Workstation (RWS) addition.120V Power will need to be fed from an available Lighting Panel. Network ethernet cable from workstation will need to be routed to the Network Cabinet in the Control Room.