Install a new circuit from Panel B at 705-N including a light switch and nine outdoor LED lights. Also, install an additional receptacle in the rig…
Battery chargers will be replaced in the K-Materials Storage Area, essentially like-for-like replacement.…
Perform a functionality assessment of Corridor 2 access hatch, K-Reactor.…
Perform interior and exterior renovations on trailers 704-24G, 704-25G, 704-30G and 704-41G.…
The 216-B sump pump has failed and a new one is needed at 105-L facility. In addition to installing a new pump, the existing sump needs to be clean…
Install/relocate new fire extinguisher hanger brackets in 221-H.…
This activity details the general operation of polymer additive manufacturing (AM) equipment (aka, 3D printers) at the AMC (935-W, Labs 136, 137, 1…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor. Revisio…
Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels withi…