This work activity is for sealing and coating the roof of 717-5N.…
Pick-up, transport and install new double-wide (DW) trailers in E-Area.…
Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…
Temporary modification to move the Saltstone Hopper Overflow Container (SHOC) to align the ports by installing a temporary duct line to connect the…
The use of a ThermoScientific Auto Titrator to determine free acid concentration of Uranium and Plutonium solutions from R and D activities.…
Evaluate / Correct Deep Well 905-20A.…
The scope of this work is for the raising, replacement, and removal of the ceilings in rooms No. 189 and No. 190 in building No. 742-A.…
Repair/replace a broken or damaged conduit at fuel station (715-F). The signal wire is broken somewhere in the conduit. The conduit is embedded in …
Warehouse awnings will be replaced at 731-1N, 731-2N and 731-3N. New downspouts will be installed with the new awnings.…
Offsite lease of office/warehouse space to support ongoing projects.…