Floor tiles that were damaged during a water issue in a hallway near Room 103 of building 736-A will be replaced. Revision 1 is necessary to includ…
Solid Waste Management Facility parking lot will be resurfaced and restriped.…
Replace H-Area Hooterville Well Pump (905-135G) at 904-56G.…
Subcontractor will repair 707-C. The Subcontractor "will not" disturb the existing roof while performing these repairs on 707-C.…
The 3D wash station currently located in 711-F will be relocated to the MTC in 766-H.…
Evaluate and correct water intrusion at 702-C.…
The RV-1 fuel has a cannister and several baskets that became stuck during transfer by the Shielded Transfer System in L Area. The reason has not b…
Asbestos remediation work to be performed at Spent Fuel Project controlled facilities in C Area…
The facility is requesting to perform a controlled vent of argon to prevent the tank's pressure relief valve from releasing the entire contents of …
Remove all insulation from around the condensate tank at 184-K.…