Subcontractor to empty propane from tanks 1 and 2 at 754-11A.…
730-B Remove Lektriever in room No. 212.…
Install UW (Universal Wiring) drops for cubicle replacement in 730-1B 3RD floor.…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
701-4G Remove/replace flooring.…
Mass Spectrometer 20 valves A2 and M2 are leaking and need to be replaced. These valves provide argon to the MS-20 system. Though they are used for…
A new AHU is needed for the 234-H Office. Existing supply ductwork from the 234-H Office AHU needs to be disconnected and removed. Once the replace…
The proposed activity (PA) is a redesign of the existing Modular Stripper (MDST) blowers under MT-TRI-2021-00034. It redesigns the existing MDST bl…
Complete 249-8H and -9H renovations per AOW…
Several nozzles in the 291-H isokinetic array are plugged with water. Removal of the water will be attempted by increasing air flow to flush it out…