The non-functional 730-1B Charging station will be replaced and in the process brought up to current fire protection requirements with increased fu…
The Materials Technology and Energy group and the Advanced Engineering group presently house three electrical resistance welding stations, inductio…
Renovations to High Bay Rooms in Training Support Building 766-H and Installation, Maintenance, and Operation of equipment for use by SRPPF Trainin…
Perform various corrective and routine maintenance activities at remediation well RWM-5 in M-Area.…
The Effluent Treatment Facility (ETF) Laboratory heating, ventilation, and air conditioning system needs to be permanently replaced due to its age …
Temporarily modify Saltstone Hopper Overflow Container (SHOC) Suction Line L-131 due to missing downcomer.…
The proposed work activity is to transfer wastewater from the F-Canyon B-Basins to the Effluent Treatment Facility (ETF) using an approved Waste Co…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
The 512-S building, which is currently in the Suspended Operations state, will be modified to temporarily store Strip Effluent (SE) from the Salt W…
Renovate the women's restroom (Room 121) at 736-A per AOS work request 00824899 Rev. 3.…