The 2-inch Readco Mixer will be operated in EDL combining premix material with salt solution in order to create a grout waste form.…
This R and D activity will investigate the effects of various processing conditions on the synthesis of catalyst materials. Isotope exchange effici…
This EEC is for the operation of a Tabletop SEM to investigate dry solids through imaging and elemental analysis.…
Operations and the Non-Destructive Examination team will insert a temporary camera into H Sump associated with 776-1A to monitor water intrusion.…
The scope of work will include general renovation in 776-2A as deemed necessary by the customer.…
The proposed work activity is to remove the 294-2F gutter and evaluate any needed repairs due to storm damage. Following the evaluation, any necess…
Rev 0 covered the upgrade of glovebox oxygen monitoring system with a Delta F analyzer and a Delta F oxygen sensor. Rev. 1 expands the cope to incl…
Office trailers 704-19H and 225-5H, are approximately 36 years old. The trailers roof, flooring and weather seals surrounding windows and door open…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement. …
This EEC covers various basic repairs and maintenance activities for Building 999-3W, such as flooring/cove base (trim) replacement, ceiling tile r…