Study the behavior of materials of interest under induction heating, including the effect of adding nanoparticles, microparticles and macroparticle…
Development and Testing of Electrochemical Denitration Systems…
Replace 291-S Zone 1 Exhaust Stack continuous air monitoring systems by: 1. Replace hotwire anemometer sensors with a pitot tube array, 2. Replace…
Use of Energy dispersive Amptek x-ray fluorescence instruments to analyze both liquid and solid samples.…
Inert glovebox operations in 786-A to support R and D in which air sensitive material will be handled. This EEC captures only the operations around…
The Bettersize S3 Plus Particle Image and Size Analyzer will be installed in 999-2W lab 154 in order to provide particle size and shape analysis fo…
In accordance with FCR M-FCR-A-00149 addressing configuration changes necessary for removal of the existing 780-1A Caustic Tank and Diaphragm Pumps…
Paint piping at 905-100F.…
The proposed work activity is to evaluate a hole in the ductwork of 221-F and perform the necessary repairs.…
This EEC covers repairs needed to the staircase in 717-10N that is damaged by termites.…