Installation of Single Wide Trailer at 711-6N.…
The JEOL JSM-6480LV SEM, along with all peripheral attachments, are to be removed and replaced by a new SEM and its needed peripheral attachments
Cut out 2 blisters and install a 20 feet x 3 feet patch using cement and membrane. Install a 3 inches drain insert using water block and an 8 feet …
Repair door and pressure wash 707-67B and 707-66B.…
This instrument will be used to characterize solid/powder materials both morphologically and chemically through image and EDS (Energy Dispersive X-…
The existing caulking on the exterior of the 291-F Breech House is deteriorating and will be repaired by applying silicone over the existing caulki…
Reroute Domestic Water Piping to Hydro Test Station in 717-F.…
Installation of an air filter into the plant air line that is feeding the plasma table in building 717-3N.…
In support of various R and D activities, gas chromatography will be used to analyze gas samples that may include (but not limited to) the followin…
The planned work is to replace the fuel oil pump for diesel fuel tank 619-2N located adjacent to building 717-8N.…