Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
C. E. Bourne Subcontractor 00000611 will provide roof repairs at 704-22G. The subcontractor will not disturb the existing roof while performing the…
An unknown well on the eastern side of K Area is within the proposed area of a new additional parking lot and is inhibiting construction for the pa…
Small samples (less than 100 mg) of porous aluminosilicate zeolite material are analyzed in an Autosorb iQ gas sorption analyzer manufactured by Qu…
751-1A Roof repairs. The subcontractor will not be disturbing the existing roof while performing the repairs.…
Replace 285-13H chorine analyzer for process cooling water system.…
Install a Retrofit Single-Ply 60 mil Thermoplastic polyolefin (TPO) Roofing System on Building 705-N.…
The Proposed Activity, during time of Construction, will remove obsolete D/3 Distributed Control System (DCS) hardware from the 233-H HP-PLC (Healt…
The current deionized water system does not produce the quality of water that can be used for analytical chemistry methods in lab 270.…
Currently, the electrical distribution system for 234-H is near end of life. Changes to the electrical distribution system are needed to improve th…