Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…
701-1K Locker Room Renovation Including New Tile Flooring, Painting, etc.…
Install Permanent Diesel Generator at 702-F.…
Repair drain standpipe at 784-7A. The standpipe and some of the associated piping used for drainage located at 784-7A has corroded resulting in lea…
The work instructions are to safely disconnect the tank from the chilled water loop and "abandon in place" per M-FCR-A-00130.…
Temporary Power will be supplied to the Process Building (210-Z) and Operations Building (704-Z) in Saltstone during B12 Outage.…
New lighting is to be installed in Cylinder Storage Building 734-Z.…
Flow Instrument FIT-7805 is to be replaced with new model at 210-S.…
Mixing of epoxy chemicals and aggregate on a small-scale to form samples of epoxy grout.…
This EEC covers special methods for the Radchem Group's postdoc projects, LDRD, nonroutine chemicals, etc.…