In 2024, surface water flow sensors were installed at two locations in Pen Branch near CMP Pits as part of the Rev 0 EEC.…
Construction to repair HVAC duct at 731-5N due to storm damage.…
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
735-4B Floor replacement in Shield Rooms.…
A hybrid material composed of a ferroelectric (BaTiO3) and a hydrogen adsorbing component (Fe2O3) will be synthesized and studied for hydrogen gas …
Operation of Shimadzu High Performance Liquid Chromatography (HPLC) in 999-2W, lab 138.…
Operation of two (2) water jets in Building 221-33F.…
Routine maintenance/replacement of overhead roll-up door at 731-2N.…
Engineering to inspect 291-F annulus and duct work within the breech house.…
EEC covers all maintenance activities performed by SRNL organizations that have the potential to disturb gasket and/or gasket-like materials in cle…