This EEC covers the building of a new room for B-level storage in 713-N.…
Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
Disassemble and Remove UPS System and repair sheetrock in 702-F. The UPS battery system is no longer in use, and it needs to be removed from 702-F.…
Install new associated utilities to support a new Ice Maker in 217-3H.…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …
In support of the Disposition Planning for the K-Area Complex, Building 108-4K is proposed for Dismantlement and Removal (D and R).…
Removal of 10 handi-houses and 3 Sealands located on one of star pad legs in B Area.…
The purpose of this scope of work is to detail the work required to safely and efficiently remove the abandoned barricade (701-19G) on Road 8. Asbe…
Removal and replacement of gutters and downspouts on the exterior of 704-4N and 704-N. Patch siding in locations where needed.…
The Saltstone Process Room ventilation is a once-through system not designed for continuous personnel occupation. Current Saltstone Process Room Ve…