105-C Assembly has some locations inside and outside with damaged transite panels (asbestos containing material). Cleanup is needed.…
Collect and dispose of asbestos containing material at the exterior assembly wall of 105-L.…
Replace cubes and carpet on 3rd Floor East Engineering Area of 730-4B. The old communications UW will be removed and new electrical and communicati…
Subcontractor will provide roof retrofit at 618-G. The Subcontractor will not disturb the existing roof while performing this retrofit on 618-G.…
Installation of electric vehicle charging stations across SRS. …
This Project is to install an automatic wet chemical fire suppression system over the griddle and stove in 246-2H Breakroom, Room 108. Fire Protect…
Clean up all asbestos debris from cracked window glazing and encapsulate remaining asbestos material in place in L-Area.…
Install Receptacles in 105-L…
This Acknowledgement of Scope provides for the repair of the sheetrock and installation of an access door for the valve behind the sheetrock in roo…
Subcontractor will provide roof retrofit at 315-M. The Subcontractor "will not" disturb the existing roof while performing this roof retrofit on 31…