105-C Assembly has some locations inside and outside with damaged panels and damaged outer area flashing. Transite panels containing asbestos are p…
The 704-60E trailer currently does not have a PA amplifier for its speakers and relies on amplifier in another trailer. The proposed activity is to…
Water and Ethylene Glycol mixture from Drum 6 in 211-9F will be drained into Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment …
Removal and Replacement of Defense Waste Processing Facility Plant Air Compressors.…
The facility needs a redesign of the current camera grout hopper lid assembly to ease maintenance activities.…
The Stack 291-F Canyon Exhaust Fan (CAEX) No. 2 Power Analyzer is not working intermittently and will be swapped with CAEX No. 3 Power Analyzer.…
Maintenance on equipment and leaks repair for MK-18A located in building 773-A shielded cells.…
A commercial, argon atmosphere furnace in 773-A, Lab D-0142, will be used for metallic sample fabrication with trace amounts of depleted uranium an…
As part of Athena project, NNSA is investing in infrastructure upgrades at SRNL to provide separation facilities. The aging infrastructure and equi…
SRNL seeks to establish the capability of performing open-air releases of chemical and biological materials on site so that the plumes may be measu…