Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Venting gas cylinder bottles for the disposal of lecture bottles thru recycling in A-Area hoods.…
Prep and apply Cool Seal to roll-up doors 1 and 2 at 705-C.…
Generators for use greater than 12 months to be added as insignificant activities.…
At the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU), one existing monitoring well (CMP 50B) has been determined to be compromise…
Maintenance will replace the packing material in the M-1 Air Stripper Column.…
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Storm drain piping in 105-L will be replaced.…
Reactor slugs and surrogate materials will be dissolved and tested in SRNL for off gas testing. Solution preparation and mock-up testing will be co…
Development of ionic liquids will be investigated in 935-W. Major activities include synthesis of ionic liquids (IL) with varying cation and anion …