Categorical Exclusion Determinations: Savannah River Operations Office

The proposed work activity is to drain three totes containing wastewater from the F-Canyon Railroad Tunnel Sump (RRTS) to the Effluent Treatment Fa…
Part of the roof of Building 281-19F was previously damaged during a storm. The building does not require a roof and to eliminate a potential safet…