Routine maintenance/replacement of overhead roll-up door at 731-2N.…
Engineering to inspect 291-F annulus and duct work within the breech house.…
EEC covers all maintenance activities performed by SRNL organizations that have the potential to disturb gasket and/or gasket-like materials in cle…
The proposed work activity is to drain three totes containing wastewater from the F-Canyon Railroad Tunnel Sump (RRTS) to the Effluent Treatment Fa…
Control room and restroom renovations at 681-3G.…
This EEC covers the evaluation and corrections of HVAC compressors units in 773-A.…
Simulants of Hanford nuclear waste will be made and spiked with radioisotopes (for example, Tc-99) so that radioactive removal processes can be tes…
Dismantle and dispose of two Handi-Houses No. SRS-PB-00685 and SRS-PB-00698 F-Retention Basin…
Part of the roof of Building 281-19F was previously damaged during a storm. The building does not require a roof and to eliminate a potential safet…
722-4A PMCS To remove 12 inches of insulation.…