CX-035699: Water Gap Road Culvert Replacement

The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…

Office of NEPA Policy and Compliance

April 28, 2026
Estimated Read Time   min

The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Road.